·
Plagiarism
should not exceed 10% maximum.
·
Follow
apa7.
·
Follow
number of pages and number of references which mentioned on each topic
·
All
reference should arranged on alphabetical arrangement from A-Z
·
You should
use at least 10 references and you should submit the references in pdf files
and should show from which pages and paragraph you took the quote.
·
You should
follow the attached formatting.
·
Research |
Research The main |
Goals of Design a |
Research 1. Does this research will 2. Does the research will make 3. Does the research will 4. Does the research will
|
Expected Cost and |
Outline
I Abstract (0.5 page)
II comparison between waterfall project management and agile
project management methods. (2 pages, 2 reference)
III. Optimization Strategies for Traditional Project Management
(Water fall) Methods in Solar Projects using agile methods (2 pages, 2
reference)
A. Identification of bottlenecks
and inefficiencies in traditional methods
B. Proposed optimization techniques for
improved project performance through the agile methods.
IV. Analysis of the Impact of Optimization on Project
Performance (2.5 pages, 2 reference)
A. Evaluation of key performance
indicators (KPIs) before and after optimization
B. Comparison of project outcomes with and
without optimization.
C. Assessment of improved project
efficiency, cost-effectiveness, and timelines
VI. Challenges and Limitations of Optimizing Traditional Project
Management Methods ( 2 pages, 2 reference )
A. Discussion of potential challenges in
implementing optimization strategies
B. Analysis of limitations and
considerations for utility-scale solar projects
VIII. Conclusion (2 pages, 2 Reference)
Did this research enhance project durations?
Did the research modify the team
performance?
Did the research optimize the
project quality?
Final remarks on the importance of optimized
project management in utility-scale solar projects