Activity 7
Part 1:
Choose two Project Management Life Cycle (PMLC) models that you have experience using or that interest you and provide two similarities and two differences. In addition, give an example of a project that could be managed using each life cycle and why?
Assignment Requirements:
- The assignment is to answer the question provided above in essay form.
- Where applicable students can include diagrams if it will help provide a pictorial view of the solution.
- This is to be in narrative form and should be as thorough as possible.
- Bullet points should not be used.
- The paper should be at least 1.5 – 2 pages in length.
- Times New Roman 12-pt font, double-spaced, 1-inch margins
- Utilizing at least one outside scholarly or professional source related to project management. The textbook should also be utilized.
- Do not insert excess line spacing.
- APA formatting and citation should be used.