- Survey emerging practices, including earned schedule and critical chain project management.
Research and respond authoritatively to the below questions, making sure your positions are supported by peer-reviewed sources:
1. What are the advantages and disadvantages of constructing a WBS using objectives or deliverables rather than activities?
2. A project is planned to produce some desired result. Should the project planners be concerned with any results that are not to be produced? Why or why not?
3. Define project scope and discuss the ramifications of scope creep.
4. What are the four primary elements of consideration in any project plan?
5. Discuss your preference for constructing the WBS in chart or list format.
6. What is an appropriate level of detail in the WBS? Why?
7. What is the primary reason for establishing CAs?
8. Where are WPs depicted, and what do they describe?
9. What would you include in an SOW that describes a WP?
10. Do you think you could use the “Obstacles and Required Conditions” technique to effectively solicit the intermediate and minor objectives of the project? Why or why not?
Write a paper of at least 2500 content words, typewritten in double-spaced format (12-point font Times New Roman), page margins Top, Bottom, Left Side and Right Side = 1 inch, including all pages,
- Show all work, including formula and result.
In your report, make certain that you include at least three (3) outside references from scholarly sources