Learning Goal: I’m working on a chemical engineering project and need the explanation and answer to help me learn.
Task Group A.
1. Prepare a neat copy of the double T ortho with all the group’s dimensions.
2. Prepare a material take-off of the double T from the ortho, giving the number, type, and size of fittings (e.g 78 ea. 4�-45deg elbows). Add up the total length of straight pipe in the spool.